Completed Project 001 kitchen

Project 001 — completed residential renovation

The estate name is awaiting confirmation. The client supplied the completion photographs below.

Project 001 overview

A completed residential renovation, including the finished kitchen.

CraftInsignia renovated this residence. The estate name is awaiting confirmation. The client supplied the completed work photographs, including the kitchen.

The finished surfaces show how layout, materials, lighting and the work of tilers, electricians, joiners and painters come together. Look for neat junctions, straight lines and coordinated finishes. Use the checklist below when reviewing any renovation. See Renovation and interior design services, or browse all renovation projects。

Estate
Awaiting confirmation
Project type
Residential renovation
Photographs
completed work

Project 001 facts

Information available for this project.

Project referenceProject 001
EstateAwaiting confirmation
Property typeResidential flat
Project typeResidential renovation
Photographic coverageClient photographs after completion, including the kitchen
Related serviceWhole-home renovation、Kitchen renovation、Bespoke joinery and furniture
Enquire about similar workContact CraftInsignia

What to look for in completion photographs

Look at junctions, levels and how materials work together.

01

Junctions

Check how cabinets meet walls, ceiling and floors, and whether tile corners and edges fit neatly.

02

Level and plumb

Cabinet door gaps, tile joints and skirting should be straight and even. Longer lines make deviations more visible.

03

Overall coordination

Observe how flooring, wall and cabinet finishes, colours and lighting work together.

Completed photographs conceal pipes, wiring, waterproofing and floor levelling. Projects with progress photographs include Quarry Bay for alterations and tiling, or Project 002 for tile installation.

Renovation handover checklist

We check finishes, alignment and function before handover. Owners can inspect the following items.

Item What to check Related work
Walls and ceilings Check smooth and consistent paintwork for cracks, colour differences or brush marks painting and plastering
Floors and tiles Check levels, straight joints and hollow sounds when gently tapped tiling and masonry
Fitted cabinets Even gaps, smooth doors and drawers, intact edge treatment Bespoke joinery
Electrical installation Check every socket, light and switch operates Plumbing and electrical work
Water supply and drainage Check taps, sinks and fittings for leaks and floor drains for free flow Bathroom renovation
Doors and windows Check operation, locks and hinges Whole-home renovation
Cleaning Look for residual dust on glass, inside cabinets and on floors Cleaning and handover

General suggestions for owners inspecting the finished work.

Completed kitchen checklist

This project includes photographs of the finished kitchen.

In a compact Hong Kong kitchen, pipework, extraction and cabinet depth need coordination. Test each item after installation:

  • Sink and tap: Run water and check supply and waste connections for leaks.
  • Cabinet doors and drawers: Check smooth opening and even gaps when closed.
  • Worktop-to-wall joint: Check the seal to prevent water entering the cabinets.
  • Sockets: Check quantity, position and operation against appliance needs.
  • Cooker hood: Test extraction.
  • Wall and floor tiles: Check joints, edging and corners for chips.

For the kitchen scope see Kitchen renovation. Our kitchen units are made in Our workshop. For board types see Boards commonly used for furniture, and for sintered-stone surfaces see Sintered-stone furniture。

. These are general kitchen checks rather than a works record for this unit.

Design behind the finished interior

Design decisions and workmanship jointly determine the finished result.

Finished result Decided during design Decided during construction
Usability Partitions, circulation and storage Whether alterations and joinery follow the drawings
Visual harmony Materials, colours and lighting Painting, tiling and cabinet workmanship
Detail quality Junction design and material transitions Accuracy of finishing, alignment and installation

CraftInsignia manages design, structural planning and construction. For the roles of each stage see how design and renovation work together. Compare material colours and grain at our Kwun Tong showroom in person.

Regulations at completion

. Some works require statutory inspection on completion.

EMSD guidance requires registered electrical contractors and workers for electrical works. The contractor must arrange inspection, testing and certification by a registered worker before energising a fixed installation. The Waterworks Ordinance governs changes to inside services. Ordinary plastering, tile finishes and repair or replacement of sanitary fittings are generally exempted building works. See regulatory requirements for renovation。

Renovation from measurement to handover

We break each design down into work that can be carried out on site.

01

Site measurement

We assess the flat, services and household routines before discussing feasible changes.

02

Quotation

The quotation sets out alterations, materials and trades to reduce disputes over extras.

03

Site management

Tiling, plumbing, electrical work, joinery and painting follow an agreed sequence, with access for inspection.

04

Inspection and handover

We check joints, levels and function with the owner before handover.

Project 001 FAQs

Questions about this project and handover inspections.

What is Project 001?

A CraftInsignia residential renovation with estate name awaiting confirmation. The client supplied the Completed photographs, including the completed kitchen.

What should I look for in finished photographs?

Look for neat junctions between cabinets, walls, floors and ceiling; straight cabinet gaps, tile joints and skirting; and coordinated colours, materials and lighting.

How do you inspect before handover?

We check junctions, levels and operation against the intended positions before handover.

What can owners check?

Check each room for smooth paint, level floors, hollow tiles, smooth doors and drawers, functioning sockets and lights, plumbing leaks and door and window operation. See the handover checklist。

What should I test in a completed kitchen?

Check sink supply and drainage for leaks, door and drawer action, worktop seals, sockets and extraction.

What certification follows electrical works?

EMSD guidance requires the registered contractor to arrange inspection, testing and certification by a registered electrical worker before energising a fixed electrical installation.

How much does a similar renovation cost?

There is no standard rate. Area, age, condition, scope, materials and joinery determine the quotation after site measurement.