Project 002 residential tiling in progress

Project 002 — residential renovation in progress

The estate name is awaiting confirmation. The client supplied these construction photographs.

Project 002 overview

A photographic record of residential tiling during construction.

CraftInsignia renovated this residence. The estate name is awaiting confirmation. The client supplied the work in progress photographs of tile installation.

Tiling forms the base for later joinery and painting. Floor levels and finished edges influence how accurately the design can be built. Progress photographs show work that furniture and cabinets will eventually conceal. See Renovation and interior design services, or browse all renovation projects。

Estate
Awaiting confirmation
Project type
Residential renovation
Photographs
work in progress

Project 002 facts

Information available for this project.

Project referenceProject 002
EstateAwaiting confirmation
Property typeResidential flat
Project typeResidential renovation
Photographic coverageClient photographs of tiling in progress
Related servicetiling and masonry、Whole-home renovation
Enquire about similar workContact CraftInsignia

Tiling sequence

Tiling includes levelling floors, rendering walls, laying floor and wall tiles and finishing edges.

01

Inspect the substrate

After strip-out, repair loose areas and uneven floors and walls.

02

Level and render

Level the floor and render the walls to provide a flat base.

03

Waterproof

Treat wet areas and form drainage falls before laying tiles.

04

Set out the tiles

Decide starting points and joint direction to minimise narrow cuts.

05

Lay tiles

Follow the layout, keeping tiles level and joints consistent.

06

Grout and finish

Complete corners, edges and thresholds after grouting, then protect finished surfaces.

These are typical stages rather than a detailed record of this flat. See tiling and masonry。

Reading tiling photographs

. Construction photographs reveal workmanship and site organisation.

  • Tile levels: Check adjacent tiles for height differences.
  • Tile joints: Look for straight, even widths.
  • Finishing: Inspect cuts at corners, walls and thresholds.
  • Drainage: Wet-area floors should fall towards the drain.
  • Site housekeeping: Look for orderly material storage and protected finished tiles.

How does tiling affect later work?

Uneven floors and crooked walls create cabinet gaps. Remeasure walls, floor and ceiling after finishing and before making cabinets. See Bespoke joinery and furniture. Cabinets are made in Our workshop.

Tiling considerations by location

Living areas, kitchens and bathrooms have different tiling priorities.

Location Priorities Related service
Living and dining room floors Large surfaces emphasise level and joint direction. Coordinate thresholds and skirting heights. tiling and masonry
Kitchen Align tiles with plumbing, cooker and cabinets. Choose surfaces that are easy to clean in cooking areas. Kitchen renovation
Bathroom Waterproof and form drainage falls before tiling and fitting sanitaryware. Consider slip resistance. Bathroom renovation
Partial replacement Match new floor height, colour and skirting, and protect adjacent areas. Partial renovation

These are typical arrangements. Actual work depends on site conditions.

Tile layout and interior design

Tile layout is part of the interior design as well as the installation.

  • Tile size and room proportions: Tile size affects joint frequency and the impression of space.
  • Starting point: Starting at a doorway, centre line or feature wall determines where cut tiles fall.
  • Joint direction: Align grout lines with walls and cabinetry where appropriate.
  • Colour and texture: Consider tiles alongside walls and cabinets.
  • Material transitions: Plan junctions with timber floors and stone thresholds.

For design and construction responsibilities, see how design and renovation work together. Compare material colours and textures in person at our Kwun Tong showroom. For sintered stone, see Sintered-stone furniture。

Regulations for tiling and renovation

. Tiling is ordinary renovation work, but associated plumbing and electrical work have separate requirements.

Government guidance classifies ordinary plastering, tile finishes and repairs or replacement of sanitary fixtures as exempted works under the Buildings Ordinance. Applicable minor works need prescribed professionals and/or registered contractors. Registered electrical contractors and workers should handle electrical work. Changes to inside water services are regulated by the Waterworks Ordinance. See regulatory requirements for renovation。

Renovation from measurement to handover

We break each design down into work that can be carried out on site.

01

Site measurement

We assess the flat, services and household routines before discussing feasible changes.

02

Quotation

The quotation sets out alterations, materials and trades to reduce disputes over extras.

03

Site management

Tiling, plumbing, electrical work, joinery and painting follow an agreed sequence, with access for inspection.

04

Inspection and handover

We check joints, levels and function with the owner before handover.

Project 002 FAQs

Questions about this project and tiling.

What is Project 002?

A CraftInsignia residential renovation. The estate is awaiting confirmation. The client supplied the Progress photographs, documenting tile installation.

Why are only progress photographs available?

The client supplied photographs during construction. They show work normally covered after completion, such as floor levelling and tiling.

What does tiling involve?

Floor levelling, wall rendering, laying tiles and finishing edges. In wet areas waterproofing and drainage falls come first. See tiling and masonry。

How can I assess tiling workmanship?

Look for level surfaces, straight even joints, neat corners and edges, free drainage in wet areas and hollow sounds when tapping tiles gently.

Does tiling need Buildings Department approval?

According to Government 1823 guidance, ordinary plastering, tile finishes and repairs or replacements of sanitary fittings are exempted works under the Buildings Ordinance.

Can tiling be quoted separately?

Yes. Tiling, services and painting can be quoted separately or included in a whole-home renovation.

How much does a similar renovation cost?

There is no standard rate. Floor area, age, condition, scope and materials affect the price. We measure before itemising alterations, materials and trades.

Tiling work on site

Planning to renovate your flat?

Contact us to arrange measurement and pricing.

contact
WhatsApp